BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Efficiency First California - ECPv6.8.2.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Efficiency First California
X-ORIGINAL-URL:https://efficiencyfirstca.org
X-WR-CALDESC:Events for Efficiency First California
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20260308T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20261101T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20260727T090000
DTEND;TZID=America/Los_Angeles:20260727T120000
DTSTAMP:20260623T161627
CREATED:20260623T231201Z
LAST-MODIFIED:20260623T231201Z
UID:69625-1785142800-1785153600@efficiencyfirstca.org
SUMMARY:2025 Title 24\, Part 6 Essentials — Nonresidential Compliance: EnergyPro Introduction
DESCRIPTION:People new to EnergyPro software will learn the basics of using this modeling software to document compliance with California’s 2025 Nonresidential Building Energy Efficiency Standards (Title 24\, Part 6 or the Energy Code). \nThroughout the class\, you will see how to use the software to complete essential tasks\, then use sample files to practice performing these tasks yourself. \nIf you do not already have a current version of EnergyPro\, we make an educational version of the software available at no charge. (A link to the trial educational version is provided with pre-registration confirmation.) \nCourse objectives include: \n\nDescribe how rules-based\, energy analysis software is used to model performance and compliance under California’s 2025 Nonresidential Building Energy Efficiency Standards (Title 24\, Part 6 or the Energy Code)\nEnter required information for the building envelope into the EnergyPro software\, fix errors identified as a result of running the project model\, adjust the Proposed Design to bring the project’s envelope into compliance\nEnter required information for the building PV and Battery Storage into the EnergyPro software\, fix errors identified as a result of running the project model\, adjust the Proposed Design to bring the project’s lighting into compliance\nEnter required information for the building mechanical systems into the EnergyPro software\, fix errors identified as a result of running the project model\, adjust the Proposed Design to bring the project’s mechanical systems into compliance
URL:https://efficiencyfirstca.org/event/2025-title-24-part-6-essentials-nonresidential-compliance-energypro-introduction/
CATEGORIES:Energy Code Ace
END:VEVENT
END:VCALENDAR