BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Efficiency First California - ECPv6.8.2.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Efficiency First California
X-ORIGINAL-URL:https://efficiencyfirstca.org
X-WR-CALDESC:Events for Efficiency First California
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20240310T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20241103T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20241211T180000
DTEND;TZID=America/Los_Angeles:20241212T203000
DTSTAMP:20260330T194337
CREATED:20241204T044443Z
LAST-MODIFIED:20241204T044443Z
UID:65425-1733940000-1734035400@efficiencyfirstca.org
SUMMARY:AC & HP Air Distribution Parts 5-8
DESCRIPTION:This second half of the eight-part series is for HVAC professionals\, from beginners to those with intermediate experience. It covers foundational principles of ducted air distribution systems and processes for Quality Installation (QI)\, Quality Maintenance (QM)\, and Quality Service (QS) for residential and light commercial systems in California. This evening series equips participants with skills to design\, install\, commission\, maintain\, service\, diagnose\, and verify ducted airflow systems\, ensuring they are safe\, reliable\, and energy-efficient. Schedule: 12/11/2024\, 6:00-8:15pm Part 5: Building\, commissioning\, and maintaining commercial duct systems. Topics include design considerations\, installation procedures\, testing\, balancing\, and regular maintenance for efficient airflow and optimal performance. Part 6: Selecting air filters and enhancing the return air side of commercial duct systems to improve overall performance. 12/12/2024\, 6:00-8:15pm Part 7: Addressing common issues in return air systems\, such as eddy currents and pressure drops\, with practical solutions for optimizing duct designs and components. Part 8: Upgrading the supply air side of commercial duct systems to reduce turbulence and optimize airflow\, including modifications to supply air plenums and duct fittings to reduce static pressure drops.\n\n\nDate & Time\n\n\n\n\n\nDec 11\, 2024 06:00 PM\nDec 11\, 2024 07:15 PM\nDec 12\, 2024 06:00 PM\nDec 12\, 2024 07:15 PM
URL:https://efficiencyfirstca.org/event/ac-hp-air-distribution-parts-5-8/
LOCATION:Online
CATEGORIES:San Diego LEARN
END:VEVENT
END:VCALENDAR