Loading Events

Optimizing Ducted Heat Pumps for Residential Electrification: Load Calculations, Equipment Selection, System Airflow and Layout

September 17, 2026

This session will deal with design, equipment choice and layout issues. The relevant performance factors are system capacity, refrigerant charge and system airflow. We will review design, installation and commissioning details for each of these performance factors. These performance factors can be applied to both conditioning and ventilation system ducts. We have designed, built and commissioned both retrofit and new construction projects that exemplify the concepts covered in class. Course content will include design examples, photos installations, and test results from commissioning.

Share This Event

2424346
DD
DAYS
HH
HOURS
MM
MIN
SS
SEC

Details

Date:
September 17
Time:
9:00 am - 12:00 pm PDT
Event Category:

Venue

  • Online

Organizer

  • Pacific Gas & Electric